So what’s the problem – A3 thinking

If you don’t know what an “A3” is, don’t worry. When I started at University of Michigan Health System, I didn’t either.  When I first saw an A3 meeting on my calendar, I asked “What group is that?”

Plan, do, check, act. PDCA on white isolated background. 3d

There were so many groups with different acronyms!  Turned out it was a meeting with a few colleagues to update our status report on major UMHS IT initiatives. We were using an A3 format for our report.

So what is an A3? It is a tool used as part of Plan-Do-Check-Act (PDCA).  The A3 name actually comes from the paper size (11 x 17 sheet) that tells a story laid out from the upper left-hand side to the lower right.

Telling the story of a problem on an A3 includes looking at the background (why and what), describing its current condition (where things stand), and doing a root cause analysis. And then, establishing goals and targets, proposing countermeasures, making an action plan and determining success metrics.   Continue reading